Naka Karuizawa | Tsuruya Karuizawa store vicinity Newly built Residence
2 bedrooms 101.95 sqm in total floor 425.56 sqm for land
Mark Down
Now for sale at: JPY 75,000,000 (tax inclusive)
Property Pictures
Aerial view by Google Earth
Neighbor view by Google Street View
The area south of Naka Karuizawa station on the Shinano Railway is the largest residential area in Karuizawa. Commercial facilities such as Tsuruya supermarket Karuizawa store, which supports the stomachs of the town's residents, are concentrated in this area, and elementary and junior high schools are within walking distance.
This property is a newly-built house under construction just north of the Tsuruya Karuizawa store (approx. 500 meters, 7-minute walk). The surrounding area is residential zones with houses and apartments, but there is also a lot of farmland remaining. The subdivided residential park where this property is under construction was also a farming field some time ago. Karuizawa Chubu Elementary School is approximately 700 meters away, an 8-minute walk, making it a convenient location for those of child-rearing age.
The house is made only of Shinshu timber, and you can feel the warmth of the house. 2 bedrooms specification is shown, but the large room on the east side has beds made in the loft, something which can be divided to 2 rooms by making a wall at the center. The room may be used as a child's room.
The house is designed and being built using the “air-pass” construction method, which allows the building to breathe by allowing “air” to “pass” between the exterior and interior walls. This structure allows moisture to escape and keeps the house warm in winter and cool in summer. There is a breathing window in the attic, which can be manually opened and closed. Please check it out for yourself when you are ready to view the house. In Karuizawa, which is known for its high humidity, moisture control is important to ensure the longevity of the house. While many house owners use a number of dehumidifiers in operation to prevent moisture, a house with the air-path construction method is a smart way to achieve this purpose.
Construction is scheduled for completion in November 2022. Contracts will be signed after completion, but we are always open for tours and appointment requests.
We look forward to hearing from interested buyer customers.